We supplied and installed a REDUNDANCY RTU PANEL (SIEMENS) at M/s. Sterling and Wilson Pvt Ltd. (FRV 50MW Plot-8) Solar power plant, Veligallu (V), Galiveedu (M), Kadapa (Dist.), A.P. The DAS has been successfully integrated to SRLDC, Bangalore and NLDC, Delhi in IEC-104 protocol.
Equipment
Siemens Redundancy RTU Panel
Protocol
IEC-104
Integrated to
SRLDC Bangalore & NLDC Delhi
11 MW cogen + 1 MW solar, 132 KV
KCP Ltd., Mukthyala, A.P.
Mukthyala, Krishna Dist., A.P.
M/s KCP Ltd. is an independent power producer with 11 MW co-generation and 1 MW solar PV plant exporting power to grid at 132 KV level. DAS and communication system is established and the system is integrated to AP SLDC on regular basis. SCHNEIDER MiCOM C264C KEMA certified RTU panel is installed to acquire plant data like bus voltage, frequency, MW and MVAR. The data output from the RTU panel is in IEC-101 protocol. The same was conveyed up to APTRANSCO 220 KV SS Chillakallu, Krishna Dist., A.P., through industrial grade RF link, since the tower line route is an interstate circuit. The data output from the RF link in IEC-101 is integrated to PUNCOM PLCC link supplied and established by us between APTRANSCO 220 KV SS Chillakallu and NARLA TATA RAO Thermal Power Station, Vijayawada. We handed over the data into the APTRANSCO broadband network, which was interconnected to APTRANSCO ALDC Nunna, Vijayawada. The project is operational in real-time since August 2014.
Equipment
Schneider MiCOM C264C RTU
Protocol
IEC-101
Communication
RF link + PUNCOM PLCC
Integrated to
APTRANSCO ALDC Nunna
43 MW Thermal
KSK Energy, Sitapuram
Dondapadu (V), Mellacheruvu (M), Nalgonda (Dist)
We supplied and installed a SCHNEIDER main & standby configuration RTU panel at Sitapuram Power Limited (43 MW Thermal) power plant, Dondapadu (V), Mellacheruvu (M), Nalgonda (Dist). The plant data was collected to the SCHNEIDER main & standby configuration RTU panel and transferred to TS TRANSCO 220/132 KV SS Sitapuram through fiber optic MUX network, where we supplied and installed another SCHNEIDER main & standby configuration RTU panel. The Sitapuram power plant data was successfully integrated to the SCHNEIDER main & standby configuration RTU panel at 220 KV/132 KV SS Sitapuram and from there on to TS SLDC Hyderabad in IEC-101 protocol and communication through PLCC link.
A.P. State Govt. prestigious irrigation project Pattisam Lift Irrigation Scheme — 220/11 KV SS Pattiseema lift irrigation load data was successfully integrated to ALDC Nunna, Vijayawada in IEC-101 protocol using SCHNEIDER main & standby configuration RTU panel and communication through PLCC link.
Equipment
Schneider main & standby RTU panel
Protocol
IEC-101
Communication
PLCC
Integrated to
ALDC Nunna, Vijayawada
Bhagyanagar India Limited, Munipally
5 MW Solar
Munipally (V&M), Sangareddy (Dist.), Telangana
We supplied and installed a SCHNEIDER RTU panel at BHAGYANAGAR INDIA LIMITED (5 MW Solar power plant), Munipally (V&M), Sangareddy (Dist.), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through AIRTEL MPLS VPN circuit.
We supplied and installed an RTU panel at RMR SOLAR ENERGY PVT. LTD. (1 MW Solar power plant), Medigadda (V), Amangal (M), Rangareddy (Dist.), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through AIRTEL MPLS VPN circuit.
Equipment
RTU panel
Protocol
IEC-104
Communication
Airtel MPLS VPN
Integrated to
TS SLDC
MLR Industries Private Limited
2 MW Solar
Bibinagar (V&M), Nalgonda (Dist.), Telangana
We supplied and installed a SCHNEIDER RTU panel at MLR INDUSTRIES PRIVATE LIMITED (2 MW Solar power plant), Bibinagar (V&M), Nalgonda (Dist.), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
We supplied and installed a SCHNEIDER RTU panel at MSR MEGA BIO POWER LIMITED (7.5 MW Solar power plant), Nidigonda (V), Raghunathapalli (M), Warangal (Dist), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
We supplied and installed a SCHNEIDER RTU panel at HYDERABAD CHEMICAL PRODUCTS PRIVATE LIMITED (1.5 MW Solar power plant), Ippepally (V), Mogudampally (M), Sangareddy (Dist.), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
Equipment
Schneider RTU panel
Protocol
IEC-104
Communication
BSNL MPLS VPN
Integrated to
TS SLDC
Peritus Corporation Private Limited
2 MW Solar
Chityal (V), Medak (M), Medak (Dist), Telangana
We supplied and installed a SCHNEIDER RTU panel at PERITUS CORPORATION PRIVATE LIMITED (2 MW Solar power plant), Chityal (V), Medak (M), Medak (Dist), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
We supplied and installed a SCHNEIDER RTU panel at TROPICAL FLAVOURS PRIVATE LIMITED (1 MW Solar power plant), Medigadda Road, Amangal (M), Mahaboobnagar (Dist.), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
We supplied and installed a SCHNEIDER RTU panel at VALENS MOLECULES PRIVATE LIMITED (1 MW Solar power plant), Tadamadla (V), Biknoor (M), Kamareddy (Dist.), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
We supplied and installed a SCHNEIDER RTU panel at HERITAGE FOODS LIMITED (2.34 MW Solar power plant), Adavimasjid (V), Mulugu (M), Medak (Dist.), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
We supplied and installed a SCHNEIDER RTU panel at HETERO LABS PRIVATE LIMITED (4 MW Solar power plant), Dacharam (V), Mothkur (M), Nalgonda (Dist.), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
We supplied and installed a SCHNEIDER RTU panel at PRAGATHI GROUP (9 MW Solar Power Plant), Boinpally (V), Midjil (M), Mahaboobnagar (Dist.), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
Equipment
Schneider RTU panel
Protocol
IEC-104
Communication
BSNL MPLS VPN
Integrated to
TS SLDC
Prashanth Narayan G (PNG Solar Power Plant, Sirgapoor)
We supplied and installed a SCHNEIDER RTU panel at PRASHANTH NARAYAN G (PNG Solar Power Plant, Sirgapoor) 7 MW solar power plant, Sirgapoor (V), Kalher (M), Medak (Dist.), Telangana. The DAS has been successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
Equipment
Schneider RTU panel
Protocol
IEC-104
Communication
BSNL MPLS VPN
Integrated to
TS SLDC
M/s. Srinivasa Green Energies Private Limited
2 MW Solar
Govindpur (V), Zaheerabad (M), Medak, Telangana
We supplied and installed a SCHNEIDER RTU panel at M/s. Srinivasa Green Energies Private Limited (2 MW Solar) power plant, Govindpur (V), Zaheerabad (M), Medak, Telangana. The plant data was successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
Equipment
Schneider RTU panel
Protocol
IEC-104
Communication
BSNL MPLS VPN
Integrated to
TS SLDC
VCarve Renewable Energy Pvt. Ltd.
3 MW Solar
Kolkulpally, Mehabubnagar, Telangana
We supplied and installed an ALSTOM RTU panel at VCARVE RENEWABLE ENERGY PVT. LTD. (3 MW Solar) power plant at Kolkulpally, Mehabubnagar, Telangana. The plant data was successfully integrated to TS SLDC in IEC-104 protocol and communication through MPLS VPN circuit.
Equipment
Alstom RTU panel
Protocol
IEC-104
Communication
MPLS VPN
Integrated to
TS SLDC
Hyderabad Institute of Oncology Pvt. Ltd., Khammam
We supplied and installed a SCHNEIDER RTU panel at HYDERABAD INSTITUTE OF ONCOLOGY PVT. LTD. (1 MW Solar) power plant at Beravolu (V), Trimulayapalem (M), Khammam (Dist), Telangana. The plant data was successfully integrated to TS SLDC in IEC-104 protocol and communication through BSNL MPLS VPN circuit.
DARTYENS POWER PVT. LTD. 1 MW solar power plant at Marapaka (V), Nidmanoor (M), Nalgonda (Dist), Telangana. Plant data was successfully integrated to TS SLDC, Vidyutsoudha, Hyderabad. DAS utilised Schneider MiCOM C264C RTU and data transferred in IEC-104 protocol to TS SLDC through AIRTEL MPLS VPN circuit.
Equipment
Schneider MiCOM C264C RTU
Protocol
IEC-104
Communication
Airtel MPLS VPN
Integrated to
TS SLDC, Vidyutsoudha
Photon Energy
5.5 MW Solar
Narayankhed, Medak, Telangana
PHOTON ENERGY grid connected solar 5.5 MW solar power plant at Narayankhed, Medak, Telangana. Plant data was successfully integrated to TS SLDC, Vidyutsoudha, Hyderabad. DAS utilised Schneider MiCOM C264C RTU and data transferred in IEC-104 protocol to TS SLDC through AIRTEL MPLS VPN circuit.
Equipment
Schneider MiCOM C264C RTU
Protocol
IEC-104
Communication
Airtel MPLS VPN
Integrated to
TS SLDC, Vidyutsoudha
Mahindra Susten, Polepally
Polepally
This project has been completed successfully.
Sanvira Industries
Visakhapatnam, A.P.
This project has been completed successfully.
How we deliver these projects